|
Tender Corrigendum :
|
| Tender Corrigendum | Date | | Tender Corrigendum Publication | Company Web Site - Internet | | Tender Corrigendum Document | Can be download by Subscribers | | Tender Corrigendum | Date | | Tender Corrigendum Publication | Company Web Site - Internet | | Tender Corrigendum Document | Can be download by Subscribers |
|
|
Product Detail :
|
The project involves the design, fabrication, and installation of a floating hydrokinetic power generating unit. This includes conducting an oceanographic survey, preparing engineering design and fabrication drawings, selecting components, and developing a deployment methodology. The scope also covers the supply of a power take-off system, floating platform, and mooring system, along with assembly, integration, and commissioning of the unit. Additionally, it includes all-risk insurance for personnel and materials until commissioning is complete, transportation of personnel and materials with transit insurance, and operation and maintenance charges for the first and second years. Floating Hydrokinetic Power Generating Unit, Power Take Off System, Floating Platform, Mooring System, Assembly and Commissioning Services, All Risk Insurance, Transportation Services, Operation and Maintenance Charges
|
| Tender Detail : |
The project involves the design, fabrication, and installation of a floating hydrokinetic power generating unit. This includes conducting an oceanographic survey, preparing engineering design and fabrication drawings, selecting components, and developing a deployment methodology. The scope also covers the supply of a power take-off system, floating platform, and mooring system, along with assembly, integration, and commissioning of the unit. Additionally, it includes all-risk insurance for personnel and materials until commissioning is complete, transportation of personnel and materials with transit insurance, and operation and maintenance charges for the first and second years. |